TR · EN · DE · FR

PHOENIX L33 — Stage 1, DPF Off, EGR Off, AdBlue / SCR Off Solutions

The PHOENIX L33 ECU is used in tractor, construction vehicles from brands such as ATLAS COPCO, CLAAS, JOHN DEERE, LIEBHERR, MANITOU. The EcuPrime library holds 31 verified solution files for this ECU family.

How it works: upload your original ECU file → the system detects the ECU from the file and enables only genuinely applicable solutions → the solution is verified at hex level and applied, the checksum is corrected by the built-in PrimeChecksum → credit is charged only on successful delivery.

Available operations for this ECU

Stage 1 · 26 solutionsDPF Off (included in the Full Emission package)EGR Off (included in the Full Emission package)AdBlue / SCR Off · 2 solutionsFull Emission Off · 3 solutions
Upload Your File — Results in Seconds

Brands using this ECU

BrandVehicle typeOperationssolutions
JOHN DEERETractorStage 1, AdBlue / SCR Off, Full Emission Off28
ATLAS COPCOConstructionStage 1, AdBlue / SCR Off, Full Emission Off3
CLAASTractor0
LIEBHERRConstruction0
MANITOUConstruction0

Frequently asked questions

Can DPF Off be done on PHOENIX L33?

Yes. The EcuPrime library has a verified DPF Off solution for PHOENIX L33 (included in the Full Emission package). When you upload your original file, compatibility is measured at hex level.

Can EGR Off be done on PHOENIX L33?

Yes. The EcuPrime library has a verified EGR Off solution for PHOENIX L33 (included in the Full Emission package). When you upload your original file, compatibility is measured at hex level.

Can AdBlue / SCR Off be done on PHOENIX L33?

Yes. The EcuPrime library has a verified AdBlue / SCR Off solution for PHOENIX L33. When you upload your original file, compatibility is measured at hex level.

Can Stage 1 be done on PHOENIX L33?

Yes. The EcuPrime library has a verified Stage 1 solution for PHOENIX L33. When you upload your original file, compatibility is measured at hex level.

How many credits does a PHOENIX L33 job cost?

A module job costs 1 credit and Stage 1 costs 3 credits; no credit is charged if no result is delivered.